User Tools

Site Tools


bdev:x_and_z_drive_systems

This is an old revision of the document!


X and Z drive systems

After setting up the Y rails now its time to set up X drive. The first step is to get attach an extrusion to the 2 Y sliders:

HFS5-2020-552-TPW X rail

Don’t fasten the X slider extrusion too tightly yet, since now you need to assemble the X slider

bdev/x_and_z_drive_systems.1601131233.txt.gz · Last modified: 2021/08/16 22:21 (external edit)